Charging infrastructure — concepts and station types
Two station types. One integrated network.
A charging hub in Nigeria is a small power plant, not a car park — so every site is designed as one, sized to what it actually needs to do. Hub 1 also doubles as a destination, not just a charging stop. These are concepts and renderings, not architectural drawings.
A
The Integrated Hub
Our own fleet's base of operations: generation, storage, fast and slow charging, a co-located workshop, shared co-working space, food service and rest pods, under one roof. This is the Hub 1 concept already committed for the Abuja pilot.
B
The Partner Charge Point
A lighter footprint, hosted on someone else's site — charging-as-a-service sold to the host, not a MOBIGRID-owned depot. No generation, storage or workshop of its own.
A
Integrated Hub — isometric concept
Eight zones on one site: solar generation, battery storage, AC and DC charging, the workshop, shared co-working space, food service, and rest pods.
Generation200 kWp solar canopy
Storage500 kWh battery
Charging, AC8 × 22 kW bays
Charging, DC fast2 bays
TechnicalWorkshop & parts store
Co-workingShared workspace for hub visitors
Food serviceFast food kiosk
Rest podsShort-stay nap rooms
Concept rendering, not an architectural drawing — proportions are illustrative. Charging and infrastructure figures match Hub 1 as specified on the Abuja Pilot page; co-working, food service and rest pods are newly committed to the same Phase 0 estimate, pending firm quotation like the rest of the site.
B
Partner Charge Point — site schematic
No generation or storage of our own — power is drawn from the host site. AC charging only; no on-site workshop.
Charging, ACA handful of bays, sized to the host site
No storage
No workshop
Integrated Hub vs Partner Charge Point
Line
Integrated Hub
Partner Charge Point
Power
Own solar & storage, grid Band A backup
Drawn from the host site
Charging
8 × 22 kW AC, 2 DC fast
AC only, sized to the site
Workshop
Co-located, high-voltage capable
None on site
Serves
Our own fleet, plus public/third-party charging
Host-site drivers and visitors
Ownership
MOBIGRID-built and operated
Charging-as-a-service on the host's site
The Integrated Hub figures match Hub 1 as specified on the Abuja Pilot page — nothing here is a new
commitment. The Partner Charge Point is deliberately described without invented precision: real siting,
power availability and charger count depend on the host and haven't been fixed yet.
A future concept, not yet specified: corridor or rapid-charge stops along intercity
routes, for longer trips than a depot-based fleet is built around. This is directional — no site, power
level or timeline is committed. It is not part of the Abuja pilot.