A charging hub in Nigeria is a small power plant, not a car park — so every site is designed as one, sized to what it actually needs to do. Hub 1 also doubles as a destination, not just a charging stop. These are concepts and renderings, not architectural drawings.

A

The Integrated Hub

Our own fleet's base of operations: generation, storage, fast and slow charging, a co-located workshop, shared co-working space, food service and rest pods, under one roof. This is the Hub 1 concept already committed for the Abuja pilot.

B

The Partner Charge Point

A lighter footprint, hosted on someone else's site — charging-as-a-service sold to the host, not a MOBIGRID-owned depot. No generation, storage or workshop of its own.

A

Integrated Hub — isometric concept

Eight zones on one site: solar generation, battery storage, AC and DC charging, the workshop, shared co-working space, food service, and rest pods.

Generation200 kWp solar canopy
Storage500 kWh battery
Charging, AC8 × 22 kW bays
Charging, DC fast2 bays
TechnicalWorkshop & parts store
Co-workingShared workspace for hub visitors
Food serviceFast food kiosk
Rest podsShort-stay nap rooms

Concept rendering, not an architectural drawing — proportions are illustrative. Charging and infrastructure figures match Hub 1 as specified on the Abuja Pilot page; co-working, food service and rest pods are newly committed to the same Phase 0 estimate, pending firm quotation like the rest of the site.

B

Partner Charge Point — site schematic

No generation or storage of our own — power is drawn from the host site. AC charging only; no on-site workshop.

Integrated Hub vs Partner Charge Point
LineIntegrated HubPartner Charge Point
PowerOwn solar & storage, grid Band A backupDrawn from the host site
Charging8 × 22 kW AC, 2 DC fastAC only, sized to the site
WorkshopCo-located, high-voltage capableNone on site
ServesOur own fleet, plus public/third-party chargingHost-site drivers and visitors
OwnershipMOBIGRID-built and operatedCharging-as-a-service on the host's site

The Integrated Hub figures match Hub 1 as specified on the Abuja Pilot page — nothing here is a new commitment. The Partner Charge Point is deliberately described without invented precision: real siting, power availability and charger count depend on the host and haven't been fixed yet.

A future concept, not yet specified: corridor or rapid-charge stops along intercity routes, for longer trips than a depot-based fleet is built around. This is directional — no site, power level or timeline is committed. It is not part of the Abuja pilot.